HENAN YUBO / GLASS MANUFACTURING
Insulating glass units for building envelopes.
Yubo's architectural-glass product materials include insulating glass and LOW-E glazing. The documented factory configuration includes two insulating-glass lines, alongside flat and curved glass processing.
Discuss your specification ↗
Product and enquiry overview
- Product family
- Insulating glass units and LOW-E glazing
- Documented processing
- Insulating-glass assembly alongside flat and curved processing
- Illustration
- Puyang Data Center concept visual; not a completed-site photograph
Procurement questions
What is the difference between an IGU and a glass coating?
An insulating glass unit combines panes with sealed cavities. LOW-E describes a coating that can form part of a glazing specification. Identify the complete arrangement, coating position and performance targets when asking for a proposal.
What information helps compare IGU quotations?
Supply the glass and cavity arrangement, unit dimensions, quantity, spacer and gas requirements if specified, coating details and project destination. State the thermal and optical targets and ask for results for the proposed assembly.
Does a LOW-E category establish a U-value or solar performance?
A coating category alone does not specify the performance of a complete unit. Ask the supplier to identify the build-up and the basis of quoted thermal, solar and light-transmission figures for your project.
Describe the glazing build-up and requirements
An insulating-glass unit specification needs to identify the glass layers and cavity arrangement, as well as overall panel size. Include the proposed coating, glass treatment, spacer or cavity requirements and any project drawings available for review.
Yubo's materials describe single-, double- and triple-silver LOW-E product categories. These category names do not replace project-specific thermal, optical or safety requirements. Ask for confirmation of the proposed build-up and the documentation needed for your project.
A documented architectural application
The Puyang Data Center project record describes shaped triple-glazed units and single-, double- and multi-curved processing. The illustration on this page is a concept visual from the supplied project materials.
For a quotation discussion, send the destination, application, quantities, panel schedule and required performance values. Available compositions, production feasibility and supporting test information should be agreed for the actual assembly before an order is finalised.
Company and product documents
View the reference scans supplied with Yubo's company profile. Request complete, current documents matching the proposed product and project requirements before approving an order.
A company document, equipment photograph or report for one product does not establish certification for a different assembly or destination market.
START A PROJECT
Tell us what the glass needs to do.
Send drawings, panel dimensions, glass build-up, quantity and project destination. Contact Yubo to discuss feasibility and the documents required for your project.